Small Community in Rural Counties Grant Program,
Preliminary Conditionally Approved List
 
Jurisdiction Project Description Grant Amount Other Funds Total Project

ABERDEEN, CITY OF

CENTRAL BUSINESS DISTRICT SIDEWALKS - Complete a major portion of the downtown sidewalks between Wishkah and Heron .

 $712,000

 $150,000

 $862,000

CLARKSTON, CITY OF

6th STREET LIGHTING PROJECT – Project will install lighting, repair sidewalks, streetscaping, and installing waterlines.

 $334,610

 $

 $334,610

CHINOOK WATER DISTRICT

RAW WATER IMPOUNDMENT REPAIR AND REPLACEMENT - Project will drain the impoundment reservoir to repair raw water intake valve and dredge reservoir to remove accumulated sediment. 

 $634,000

 $

 $634,000

GRANDVIEW, CITY OF

"ALIVE" DOWNTOWN IMPROVEMENTS - Reconstruction of 3,600 feet of arterial streets and sidewalks, trees, street and pedestrian lighting and other streetscape amenities.  Project also includes the replacement of over 70 failing water servicers and pipelines .

 $700,000

 $,081,000

 $,781,000

GRANT COUNTY PORT DISTRICT #3-PORT OF MATTAWA

PORT OF MATTAWA PROCESS WATER SYSTEM - Project will construct lift station, and piping, and an amendment well to provide water to the industrial park. 

 $476,000

 $2,250,000

 $2,726,000

KITTITAS, CITY OF

FIRE, POLICE, AND ADMIN FACILITY RENOVATION - Removal of the city's existing fire station, police and administrative facility.  Project will provide 10,000 sq ft of renovated space.  Deficiencies in the HVAC, and electrical will be corrected.

 $290,000

 $959,668

 $1,249,668

LEWIS COUNTY PUD #1

FIBER OPTIC PROJECT - Project will extend the PUD's current fiber optic network and install 11.25 miles of aerial fiber optic cable from Mossyrock to Morton. 

 $149,940

 $224,910

 $374,850

SKAMANIA COUNTY, PORT OF

CASCADES BUSINESS PARK - NORTH BONNEVILLE - Extend and construct 2,630 feet of municipal water main and 2,630 feet of sanitary sewer line to the Cascades Business Park. 

 $600,000

 $303,560

 $903,560

MOUNT VERNON, CITY OF

DOWNTOWN FLOOD PROTECTION AND SKAGIT RIVER WALK PROJECT - Project will be the first segment to provide flood protection for the city.  Project will install 1,300 feet of sheet pile flood wall system from Division Street Bridge to Lion's Park and across Freeway Drive.  In addition to the flood protection measure, a 16-24 foot wide public river trail will be constructed along the wall alignment. 

 $800,000

 $1,399,984

 $2,199,984

NORTH BONNEVILLE, CITY OF

WASTEWATER TREATMENT PLANT PROJECT - Construction of a new wastewater treatment plant. 

 $2,262,182

 $200,000

 $,462,182

PASCO, CITY OF

ROAD 40 EAST SEWER - Construction of sewer pipeline from "A" Street to SR 12 which would provide the sewer service for vacant land zoned commercial and industrial.

 $550,000

 $191,050

 $741,050

PONDORAY SHORES WATER & SEWER DISTRICT

WATER AND SEWER UPGRADES - Project will address the following:  improvements to the pump house, including and addition for office, installation of well #2, automatic alarm dialer, emergency generator, road improvements and parking lot, an distribution system improvements. 

 $424,106

 $968,900

 $1,393,006

PORT TOWNSEND, CITY OF

HISTORIC DISTRICT MADISON STREET STREETSCAPE - Project will include the following:  sidewalks, storm drains, vertical curb, curb and gutter, trench drain, CIP concrete band, asphalt pavement, pavers, and kiosks.

 $618,000

 $150,000

 $768,000

UNION GAP, CITY OF

VALLEY MALL BLVD PHASE IV AND RUDKING ROAD ROUNDABOUTS - Construction of improvements to the 1,400 foot long portion of Valley Mall Boulevard from Interstate 82 to Main Street.  Project includes: widening of roads, roundabouts, center turn lane and bike lane, curbs and gutters on both sides of roadway, sidewalks, storm drainage system, replacement of water and sewer lines, lighting, signing and pavement markings, and improvement to signals of new lane configurations.

 $700,000

 $15,052,000

 $15,752,000

RAYMOND, CITY OF

RAYMOND POOL - Project will resolve ADA, L&I building code violations, and install an ADA approved lift and safety drains in the pool.  Repairs to cracked and leaking upper deck and lower floor, resurface pooled deck and lower level floors.  Repair cracks in the pool, covert propane heating system to electrical heating, and install a pool cover.  Upgrade locker room facilities, and damaged electrical panel and wiring. 

$328916

 $ 9,924

 $358,840

REPUBLIC PUBLIC DEVELOPMENT AUTHORITY

TORBOY INDUSTRIAL PARK - Project will include construction of a 6,000sq foot steel frame building and construction of a pole building to cover existing office trailer. Building improvements include skylight replacement, patching and painting, interior doors, and other accessories, broadband installation, radiant heating, plumbing, electrical and ADA accessibility.  Road access upgrades, and sewer and water system installation.

 $193,928

 $280,000

 $473,928