Small Community in Rural Counties Grant Program,
Preliminary Conditionally Approved List
|
|
Jurisdiction |
Project Description |
Grant Amount |
Other Funds |
Total Project |
|
ABERDEEN, CITY OF |
CENTRAL BUSINESS DISTRICT SIDEWALKS
- Complete a major portion of the downtown sidewalks between Wishkah
and Heron . |
$712,000
|
$150,000
|
$862,000
|
|
CLARKSTON, CITY OF |
6th STREET LIGHTING PROJECT –
Project will install lighting, repair sidewalks, streetscaping, and
installing waterlines. |
$334,610
|
$
|
$334,610
|
|
CHINOOK WATER
DISTRICT |
RAW WATER IMPOUNDMENT REPAIR AND REPLACEMENT -
Project will drain the
impoundment reservoir to repair raw water
intake valve and dredge reservoir to remove accumulated sediment.
|
$634,000
|
$
|
$634,000
|
|
GRANDVIEW, CITY OF |
"ALIVE" DOWNTOWN IMPROVEMENTS -
Reconstruction of 3,600 feet of arterial streets and sidewalks,
trees, street and pedestrian lighting and other streetscape
amenities. Project also includes the replacement of over 70 failing
water servicers and pipelines . |
$700,000
|
$,081,000
|
$,781,000
|
|
GRANT COUNTY PORT DISTRICT #3-PORT OF MATTAWA |
PORT OF MATTAWA PROCESS WATER SYSTEM -
Project will construct lift station, and piping, and an amendment
well to provide water to the industrial park. |
$476,000
|
$2,250,000
|
$2,726,000
|
|
KITTITAS, CITY OF |
FIRE, POLICE, AND ADMIN FACILITY RENOVATION -
Removal of the city's existing fire station, police and
administrative facility. Project will provide 10,000 sq ft of
renovated space. Deficiencies in the HVAC, and electrical will be
corrected. |
$290,000
|
$959,668
|
$1,249,668
|
|
LEWIS COUNTY PUD #1 |
FIBER OPTIC
PROJECT -
Project will extend the PUD's current fiber optic network and
install 11.25 miles of aerial fiber optic cable from Mossyrock to
Morton. |
$149,940
|
$224,910
|
$374,850
|
|
SKAMANIA COUNTY, PORT OF |
CASCADES BUSINESS PARK - NORTH BONNEVILLE -
Extend and construct 2,630 feet of municipal water main and 2,630
feet of sanitary sewer line to the Cascades Business Park.
|
$600,000
|
$303,560
|
$903,560
|
|
MOUNT VERNON, CITY OF |
DOWNTOWN FLOOD PROTECTION AND SKAGIT
RIVER WALK PROJECT -
Project will be the first segment to provide flood protection for
the city. Project will install 1,300 feet of sheet pile flood wall
system from Division Street Bridge to Lion's Park and across Freeway
Drive. In addition to the flood protection measure, a 16-24 foot
wide public river trail will be constructed along the wall
alignment. |
$800,000
|
$1,399,984
|
$2,199,984
|
|
NORTH BONNEVILLE, CITY OF |
WASTEWATER TREATMENT PLANT PROJECT -
Construction of a new wastewater treatment plant.
|
$2,262,182
|
$200,000
|
$,462,182
|
|
PASCO, CITY OF |
ROAD 40 EAST SEWER -
Construction of sewer pipeline from "A" Street to SR 12 which would
provide the sewer service for vacant land zoned commercial and
industrial. |
$550,000
|
$191,050
|
$741,050
|
|
PONDORAY SHORES WATER & SEWER DISTRICT |
WATER AND SEWER UPGRADES -
Project will address the following: improvements to the pump house,
including and addition for office, installation of well #2,
automatic alarm dialer, emergency generator, road improvements and
parking lot, an distribution system improvements. |
$424,106
|
$968,900
|
$1,393,006
|
|
PORT TOWNSEND, CITY OF |
HISTORIC DISTRICT MADISON STREET STREETSCAPE -
Project will include the following: sidewalks, storm drains,
vertical curb, curb and gutter, trench drain, CIP concrete band,
asphalt pavement, pavers, and kiosks. |
$618,000
|
$150,000
|
$768,000
|
|
UNION GAP, CITY OF |
VALLEY MALL BLVD PHASE IV AND RUDKING ROAD ROUNDABOUTS -
Construction of improvements to the 1,400 foot long portion of
Valley Mall Boulevard from Interstate 82 to Main Street. Project
includes: widening of roads, roundabouts, center turn lane and bike
lane, curbs and gutters on both sides of roadway, sidewalks, storm
drainage system, replacement of water and sewer lines, lighting,
signing and pavement markings, and improvement to signals of new
lane configurations. |
$700,000
|
$15,052,000
|
$15,752,000
|
|
RAYMOND, CITY OF |
RAYMOND POOL -
Project will resolve ADA, L&I building code violations, and install
an ADA approved lift and safety drains in the pool. Repairs to
cracked and leaking upper deck and lower floor, resurface pooled
deck and lower level floors. Repair cracks in the pool, covert
propane heating system to electrical heating, and install a pool
cover. Upgrade locker room facilities, and damaged electrical panel
and wiring. |
$328916 |
$ 9,924
|
$358,840
|
|
REPUBLIC PUBLIC DEVELOPMENT AUTHORITY |
TORBOY INDUSTRIAL PARK -
Project will include construction of a 6,000sq foot steel frame
building and construction of a pole building to cover existing
office trailer. Building improvements include skylight replacement,
patching and painting, interior doors, and other accessories,
broadband installation, radiant heating, plumbing, electrical and
ADA accessibility. Road access upgrades, and sewer and water system
installation. |
$193,928
|
$280,000
|
$473,928
|
|